Your browser does not support script

Projects

Exploration & Development

2011 Drilling Program



Costebelle Claim Group
A total of 2,576 meters in 14 drill holes was completed during winter 2011 at the Costebelle A4 Zone. Drilling highlights included 10.5 meters of 483 ppm (0.048% or 0.96 lbs/t) U3O8 and 43.5 meters of 193ppm (0.019% or 0.38 lbs/t) U3O8 in CA4-11-42, 17.6 meters of 252 ppm (0.025% or 0.5 lbs/t) U3O8 in CA4-11-38, and 15 meters of 337 ppm (0.034% or 0.68 lbs/t) U3O8 in CA4-11-46.

A total of 580 meters in 4 drill holes was completed during winter 2011 at the C-C-11 Zone. Highlights include 12.5 metres of 0.032% (322 ppm or 0.64 lbs/t) U308 in CC11-10-05. These results lie within an area of mineralization within an overall radiometric anomaly of approximately 1200 metres (1.2 km), and is open along strike. C-C-11 is located approximately 3 kilometres east of the A4 Zone.


Email '2011' to a friendShow printable version of '2011' in a New Window
Corporate Presentation
Fact Sheet
Financials
Subscribe for Updates
Video